Shaw Tower

Home / Work / Shaw Tower

Shaw Tower

Beach Road Commercial 2025

The Brief

35-storey commercial tower refurbishment — BIM coordination role managing federated model across 6 disciplines.

Project Data

Client Confidential (Singapore Client)
Area 71 400 m²
Floors 35 floors
Duration 14 months
Disciplines Coord
Software Navisworks · ACC · Revit
Standards ISO 19650 · BCA Singapore

71 400 M² · 35 FLOORS · 14 MONTHS

Our Approach

How we approached it.

Refurbishment BIM coordination is materially different from new-build: the existing building fabric introduces survey tolerances and as-built discrepancies that must be resolved before new-works models can be trusted. We established a point-cloud-to-model tolerance protocol in week one and federated against the as-built baseline throughout.

Six discipline models — architecture, structure, HVAC, plumbing, electrical, and façade — were federated weekly in Navisworks. An issue register was maintained in ACC and reviewed with the design team every Tuesday. Clash resolution was tracked to close-out.

Approach image 1
Approach image 2

3D Model

Explore the model.

3D Model · TBD

Outcome

What it delivered.

  1. Six-discipline federated model maintained throughout 14-month programme
  2. Issue register closed out with zero unresolved P1 clashes at construction start
  3. As-built BIM model delivered at practical completion