Tengah Gardens

Home / Work / Tengah Gardens

Tengah Gardens

Tengah Residential 2026

The Brief

Large-scale residential estate — full BIM coordination across the development's multiple residential blocks.

Project Data

Client Confidential (Singapore Developer)
Area 118 000 m²
Type Estate
Duration 24 months
Disciplines Full BIM
Software Revit 2025 · ACC · Navisworks
Standards BCA Singapore · ISO 19650

118 000 M² · ESTATE · 24 MONTHS

Our Approach

How we approached it.

Estate-scale coordination requires a block-by-block model structure that can be managed independently and federated at estate level. We authored the coordination protocol for the full estate, established the ACC project structure with a zone-based model breakdown, and assigned coordination leads per block.

Weekly clash detection runs were conducted at both block and estate level. Block-level runs caught discipline conflicts within each building; estate-level runs identified cross-block services coordination issues — particularly at the central utilities spine.

Approach image 1
Approach image 2

3D Model

Explore the model.

3D Model · TBD

Outcome

What it delivered.

  1. Estate-wide BIM coordination protocol established and adopted across all blocks
  2. Cross-block services clashes identified and resolved in coordination phase
  3. Programme on track at 24-month milestone